SR 122 over I-75 (EXIT 29)

W EDGE OF HAHIRA CITY LIM · County 185, Georgia · Built 2019 · 4 Lanes · 8,010 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018550920
Year Built
2019
Length
79.2 m (259.8 ft)
Max Span
39.6 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
8,010
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,088,000
Total Project Cost
$34,632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.