CAT CREEK ROAD over CAT CREEK O/F

APP 3 MI SW OF BARRETTS · County 185, Georgia · Built 2005 · 2 Lanes · 2,610 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018550710
Year Built
2005
Length
35.4 m (116.1 ft)
Max Span
11.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,610
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$453,000
Total Project Cost
$680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.