OUSLEY ROAD over TIGER CREEK

9 MI SW OF VALDOSTA · County 185, Georgia · Built 1971 · 2 Lanes · 960 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000018550070
Year Built
1971
Length
32.9 m (107.9 ft)
Max Span
11 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
960
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$422,000
Total Project Cost
$633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.