I-75 over SR 38 (US 84) EXIT 16
VALDOSTA - WESTSIDE · County 185, Georgia · Built 1961 · 8 Lanes · 56,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.818192, -83.316383
This bridge is in worse condition than 36.9% of bridges in County 185. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
I-75 over CSX RAILROAD
Built 1961
W MAGNOLIA ROAD over SUGAR CREEK
Built 1980
LANKFORD DRIVE over SUGAR CREEK
Built 1970
HIGHTOWER STREET over SUGAR CREEK TRIB
Built 1999
ONE MILE BRANCH RO over ONE MILE BRANCH
Built 1990
LAMAR STREET over SUGAR CREEK
Built 1970
US 84 over NORFOLK SOUTHERN RAILROA
Built 2014
I-75 over MUD CREEK
Built 1961
MELODY LANE over ONE MILE BRANCH
Built 1970
WAINWRIGHT DRIVE over ONE MILE CREEK
Built 1970
Bridge Details
- Structure #
- 000000018500470
- Year Built
- 1961
- Reconstructed
- 1995
- Length
- 49.7 m (163.1 ft)
- Max Span
- 13.4 m
- Width
- 49.7 m (163.1 ft)
- Lanes
- 8
- Daily Traffic
- 56,400
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,679,000
- Total Project Cost
- $2,519,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.