I-75 over VALDOSTA RAILWAY
APP 5 MI S VALDOSTA · County 185, Georgia · Built 1961 · 6 Lanes · 55,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
30.771531, -83.291419
This bridge is in worse condition than 36.9% of bridges in County 185. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
OLD CLYATTVILLE RD over I-75
Built 1993
CLYATTVILLE ROAD over MUD CREEK
Built 1998
SR 31 over I-75 (EXIT 11) SR 31 (NB
Built 2024
I-75 over MUD CREEK
Built 1961
SR 31 over MUD CREEK
Built 1974
INNER PERIMETER- U over CSX RAILROAD
Built 1989
SR 31 over SWAMP CREEK
Built 1937
LOCH LAUREL ROAD over LAKE LOCH LAUREL TRIB
Built 2002
TUCKER ROAD over DUKES BAY CANAL
Built 2014
GIL HARBIN ROAD over DUKES BAY CANAL
Built 1978
Bridge Details
- Structure #
- 000000018500410
- Year Built
- 1961
- Reconstructed
- 1995
- Length
- 40.2 m (131.9 ft)
- Max Span
- 13.4 m
- Width
- 42.4 m (139.1 ft)
- Lanes
- 6
- Daily Traffic
- 55,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,078,000
- Total Project Cost
- $1,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.