I-75 over BEVEL CREEK

APP 2 MI N OF LAKE PARK · County 185, Georgia · Built 1961 · 6 Lanes · 52,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018500360
Year Built
1961
Reconstructed
1995
Length
45.7 m (149.9 ft)
Max Span
15.2 m
Width
42.9 m (140.7 ft)
Lanes
6
Daily Traffic
52,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,225,000
Total Project Cost
$1,838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.