US 84 (WBL) SR 38 over GRAND BAY CREEK

APP 1 MI W OF NAYLOR · County 185, Georgia · Built 1948 · 2 Lanes · 11,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000018500160
Year Built
1948
Reconstructed
1992
Length
90.5 m (296.9 ft)
Max Span
8.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
11,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,160,000
Total Project Cost
$1,741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.