US 25 SR 23 over BACK SWAMP/CORKER BR

3 MI W OF LUDOWICI · County 183, Georgia · Built 1993 · 2 Lanes · 13,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018300330
Year Built
1993
Length
100.6 m (330.1 ft)
Max Span
10.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
13,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,289,000
Total Project Cost
$1,934,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.