US 25 SR 23 over BACK SWAMP

3 MI W OF LUDOWICI · County 183, Georgia · Built 1954 · 2 Lanes · 13,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000018300030
Year Built
1954
Reconstructed
1994
Length
211.2 m (692.9 ft)
Max Span
10.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
13,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,708,000
Total Project Cost
$4,062,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.