US 378 SR 43 over SOAP CREEK

4 MI E OF LINCOLNTON · County 181, Georgia · Built 2018 · 2 Lanes · 2,360 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018150200
Year Built
2018
Length
82.3 m (270 ft)
Max Span
39.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,360
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,976,000
Total Project Cost
$35,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.