SR 79 over SOAP CREEK

2.7 MI NE OF LINCOLNTON · County 181, Georgia · Built 1993 · 2 Lanes · 3,027 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000018100200
Year Built
1993
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,027
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.