SR 196 over BAKER SWAMP

4 MILES SE OF FLEMINGTON · County 179, Georgia · Built 2010 · 2 Lanes · 21,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017950110
Year Built
2010
Length
84.4 m (276.9 ft)
Max Span
12.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
21,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,082,000
Total Project Cost
$1,623,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.