OCEAN HIGHWAY-US17 over BAKER SWAMP

IN CITY LIMITS OF MIDWAY · County 179, Georgia · Built 1955 · 2 Lanes · 7,760 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017900100
Year Built
1955
Length
30.2 m (99.1 ft)
Max Span
10.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
7,760
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$387,000
Total Project Cost
$580,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.