US 80/SR 26 over INDIAN BRANCH

5.2 MI SE OF BREWTON · County 175, Georgia · Built 2024 · 2 Lanes · 3,027 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000017551220
Year Built
2024
Length
36.6 m (120.1 ft)
Max Span
36.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
3,027
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,656,000
Total Project Cost
$15,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.