SR 29 over PUGHES CREEK

7 MI SE OF EAST DUBLIN · County 175, Georgia · Built 2021 · 2 Lanes · 2,270 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000017551190
Year Built
2021
Length
70.1 m (230 ft)
Max Span
15.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,270
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,494,000
Total Project Cost
$30,636,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.