I-16 (EBL) over PUGHES CREEK

6.8 MI SE OF EAST DUBLIN · County 175, Georgia · Built 1964 · 2 Lanes · 23,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017500850
Year Built
1964
Reconstructed
2002
Length
46.3 m (151.9 ft)
Max Span
11.6 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
23,900
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$83,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.