EMPIRE ROAD over FIVE MILE CREEK

6.8 MI NW OF LAKELAND · County 173, Georgia · Built 1972 · 2 Lanes · 220 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017350120
Year Built
1972
Reconstructed
2007
Length
31.1 m (102 ft)
Max Span
6.1 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
220
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.