CR 27 over FIVE MILE CREEK

APP 6 MI E OF NASHVILLE · County 019, Georgia · Built 1970 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001950120
Year Built
1970
Reconstructed
2002
Length
31.1 m (102 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.