CAMP ROAD over POTATO CREEK

5 MI N OF MILNER · County 171, Georgia · Built 1960 · 2 Lanes · 270 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000017150140
Year Built
1960
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
270
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$62,000
Total Project Cost
$115,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.