J.E. TRICE ROAD over POTATO CREEK

3 MI NW OF MILNER · County 171, Georgia · Built 1960 · 2 Lanes · 960 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017150130
Year Built
1960
Reconstructed
2005
Length
42.7 m (140.1 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
960
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.