US 41 (SBL) over POTATO CREEK

2.5 MI NW OF MILNER · County 171, Georgia · Built 1967 · 2 Lanes · 7,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017100100
Year Built
1967
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
7,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.