US 129 over DRY CREEK

12 MI SE OF PERRY · County 153, Georgia · Built 1959 · 2 Lanes · 4,120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300320
Year Built
1959
Length
48.8 m (160.1 ft)
Max Span
9.8 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
4,120
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.