US 341 over BIG INDIAN CREEK

5.7 MI SE OF PERRY · County 153, Georgia · Built 1995 · 2 Lanes · 4,720 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000015300910
Year Built
1995
Length
97.5 m (319.9 ft)
Max Span
12.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
4,720
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,250,000
Total Project Cost
$1,875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.