M.F.&J.D. BRIDGE over OCMULGEE RIVER

3.3 MI E OF BONAIRE · County 153, Georgia · Built 1955 · 2 Lanes · 11,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000015300280
Year Built
1955
Reconstructed
1985
Length
321.3 m (1054.1 ft)
Max Span
30.5 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
11,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,118,000
Total Project Cost
$6,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.