SR 96 over OCMULGEE RIVER OVERFLOW

2.8 MI E OF BONAIRE · County 153, Georgia · Built 1955 · 2 Lanes · 11,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015300260
Year Built
1955
Reconstructed
1985
Length
103.6 m (339.9 ft)
Max Span
5.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
11,600
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,328,000
Total Project Cost
$1,993,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.