WHITESVILLE ROAD over STANDING BOY CREEK

11.5 MI. SSW OF HAMILTON · County 145, Georgia · Built 2007 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000014550580
Year Built
2007
Length
30.5 m (100.1 ft)
Max Span
30.5 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$391,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.