BAKER ROAD over BETHEL CREEK

4 MI W OF SHILOH · County 145, Georgia · Built 1955 · 2 Lanes · 130 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000014550420
Year Built
1955
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
130
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$94,000
Total Project Cost
$141,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.