SR 315 over I-185 @18.83N (EXIT 19)

9 MI SW OF HAMILTON · County 145, Georgia · Built 1978 · 2 Lanes · 8,610 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000014500310
Year Built
1978
Length
94.5 m (310 ft)
Max Span
35.7 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
8,610
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,211,000
Total Project Cost
$1,817,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.