HART ROAD over WALKER CREEK TRIB

3.6 MI S OF TALLAPOOSA · County 143, Georgia · Built 1988 · 2 Lanes · 126 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000014350250
Year Built
1988
Length
8.2 m (26.9 ft)
Max Span
2.1 m
Lanes
2
Daily Traffic
126
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.