CR 110 over I-20

4.5 MI S OF TALLAPOOSA · County 143, Georgia · Built 1976 · 2 Lanes · 323 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000014300100
Year Built
1976
Length
112.2 m (368.1 ft)
Max Span
29 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
323
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,438,000
Total Project Cost
$2,157,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.