ATLANTA HIGHWAY over NOR SOUTHERN RAILROAD

IN OAKWOOD · County 139, Georgia · Built 1998 · 2 Lanes · 16,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013950880
Year Built
1998
Length
86.9 m (285.1 ft)
Max Span
31.1 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
16,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,114,000
Total Project Cost
$1,670,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.