FLOWERY BRANCH RD over I-85 (SR 403)
6.5 MI N OF DACULA · County 135, Georgia · Built 2020 · 2 Lanes · 2,047 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
34.084, -83.868011
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 6 years old.
Nearby Bridges
BILL CREEK ROAD over WHEELER CREEK TRIB
Built 1997
BILL CREEK ROAD over WHEELER CREEK
Built 1997
WHEELER ROAD over WHEELER CREEK
Built 1997
SPOUT SPRINGS ROAD over I-85 (SR 403)
Built 2019
SPOUT SPRINGS RD over DUNCAN CREEK
Built 1964
DOC HUGHES ROAD over DUNCAN CREEK
Built 1989
MT MORIAH ROAD over LITTLE MULBERRY RIVER
Built 1995
I-85 over WHEELER CREEK
Built 1964
DEMOCRACY DRIVE over SHERWOOD CREEK
Built 2005
SPOUT SPRINGS RD over SHERWOOD CREEK
Built 1968
Bridge Details
- Structure #
- 000000013552820
- Year Built
- 2020
- Length
- 68.3 m (224.1 ft)
- Max Span
- 34.1 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 2,047
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $19,906,000
- Total Project Cost
- $29,859,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.