SPOUT SPRINGS ROAD over I-85 (SR 403)
3.3 MI SE OF BUFORD · County 135, Georgia · Built 2019 · 2 Lanes · 9,750 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
34.078369, -83.886253
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 7 years old.
Nearby Bridges
DOC HUGHES ROAD over DUNCAN CREEK
Built 1989
FLOWERY BRANCH RD over I-85 (SR 403)
Built 2020
BILL CREEK ROAD over WHEELER CREEK TRIB
Built 1997
SPOUT SPRINGS RD over DUNCAN CREEK
Built 1964
HAMILTON MILL RD over I-85 (SR 403)
Built 2001
BILL CREEK ROAD over WHEELER CREEK
Built 1997
WHEELER ROAD over WHEELER CREEK
Built 1997
JIM MOORE ROAD over LITTLE MULBERRY RIVER
Built 1989
MT MORIAH ROAD over LITTLE MULBERRY RIVER
Built 1995
DEMOCRACY DRIVE over SHERWOOD CREEK
Built 2005
Bridge Details
- Structure #
- 000000013552680
- Year Built
- 2019
- Length
- 63.1 m (207 ft)
- Max Span
- 31.4 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 2
- Daily Traffic
- 9,750
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $18,426,000
- Total Project Cost
- $27,639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.