85S RAMP TO 324 over LITTLE IVY CREEK TRIB

4.5M SE OF BUFORD · County 135, Georgia · Built 2021 · 1 Lanes · 6,040 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000013552790
Year Built
2021
Length
27.1 m (88.9 ft)
Max Span
27.1 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
6,040
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,918,000
Total Project Cost
$11,877,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.