MT GRAVEL SPRINGS over I-85

4.5 MILES SE OF BUFORD · County 135, Georgia · Built 2012 · 6 Lanes · 33,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013552440
Year Built
2012
Length
142 m (465.9 ft)
Max Span
52.7 m
Width
31.2 m (102.4 ft)
Lanes
6
Daily Traffic
33,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,078,000
Total Project Cost
$1,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.