MARTIN FARM ROAD over SUWANEE CREEK

IN SUWANEE · County 135, Georgia · Built 1978 · 2 Lanes · 2,047 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000013550040
Year Built
1978
Length
33.5 m (109.9 ft)
Max Span
6.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,047
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$430,000
Total Project Cost
$645,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.