BUFORD HIGHWAY-US2 over SUWANEE CREEK

0.5 MI S OF SUWANEE · County 135, Georgia · Built 1973 · 2 Lanes · 14,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000013500110
Year Built
1973
Length
104.2 m (341.9 ft)
Max Span
11.6 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
14,900
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,336,000
Total Project Cost
$2,004,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.