PTREE IND N/B over SUWANEE CREEK

1 MI N OF DULUTH · County 135, Georgia · Built 1982 · 2 Lanes · 18,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013501020
Year Built
1982
Length
85.3 m (279.9 ft)
Max Span
21.3 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
18,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,094,000
Total Project Cost
$1,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.