US 78 / SR 10 over YELLOW RIVER

3 MI W OF SNELLVILLE · County 135, Georgia · Built 1970 · 6 Lanes · 49,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013500080
Year Built
1970
Reconstructed
1979
Length
53 m (173.9 ft)
Max Span
17.7 m
Width
23.9 m (78.4 ft)
Lanes
6
Daily Traffic
49,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,422,000
Total Project Cost
$2,132,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.