RAMP TO STONE MTN. over SR 10 EBL-SR 10R TO 5242

2.45 MI NE OF STONE MTN · County 089, Georgia · Built 1963 · 4 Lanes · 900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008901300
Year Built
1963
Length
62.2 m (204.1 ft)
Max Span
17.4 m
Width
19.7 m (64.6 ft)
Lanes
4
Daily Traffic
900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,232,000
Total Project Cost
$1,848,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.