NORTH POOL ROAD over CSX RAILROAD (279580S)

IN NORTH GREENSBORO · County 133, Georgia · Built 1985 · 2 Lanes · 1,153 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013300350
Year Built
1985
Length
64.9 m (212.9 ft)
Max Span
26.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,153
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$832,000
Total Project Cost
$1,248,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.