SR 15 over BEAVERDAM CREEK

2.7 MI N OF GREENSBORO · County 133, Georgia · Built 1930 · 2 Lanes · 4,760 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000013300080
Year Built
1930
Length
6.4 m (21 ft)
Max Span
3 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
4,760
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$82,000
Total Project Cost
$123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.