HADLEY FERRY ROAD over OCHLOCKNEE RIVER O/F

APP 10 MI S OF CAIRO · County 131, Georgia · Built 1973 · 2 Lanes · 440 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013100430
Year Built
1973
Length
92 m (301.8 ft)
Max Span
19.8 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
440
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,180,000
Total Project Cost
$1,770,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.