HADLEY FERRY ROAD over OCHLOCKNEE RIVER

APP 9 MI S OF CAIRO · County 131, Georgia · Built 1973 · 2 Lanes · 440 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000013100420
Year Built
1973
Length
164 m (538.1 ft)
Max Span
18.3 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
440
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,102,000
Total Project Cost
$3,153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.