US-25 US-341 SR over BURNT CREEK
3 MI E OF WAYNE CTY LINE · County 127, Georgia · Built 1996 · 2 Lanes · 740 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.372892, -81.627231
This bridge is in worse condition than 10.7% of bridges in County 127. The average bridge in Georgia is 0 years old; this one is 30 years old.
Nearby Bridges
US-25 US-341 SR over BURNT CREEK
Built 1996
US-25 US-341 SR over CLAY HOLE SWAMP
Built 1996
US-25 US-341 SR over CLAY HOLE SWAMP
Built 1996
US-25 US-341 SR over EVERETT CREEK
Built 1996
US-25 341 SR 27 over EVERETT CREEK
Built 1996
US-25 US-341 SR over COWPEN SWAMP CREEK
Built 1996
US-25 US-341 SR over COWPEN SWAMP CREEK
Built 1996
US 25 SR 27 GOLDE over PIGEON BRANCH TRIB
Built 1933
US 25 US-341 SR over ZUTA BRANCH
Built 1940
US 25 (WBL) over ALEX CREEK
Built 1973
Bridge Details
- Structure #
- 000000012750140
- Year Built
- 1996
- Length
- 31.1 m (102 ft)
- Max Span
- 10.4 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 740
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $399,000
- Total Project Cost
- $598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.