LOWER CARTECAY RD over CARTECAY RIVER

6 MI SE OF ELLIJAY · County 123, Georgia · Built 2024 · 2 Lanes · 323 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012350750
Year Built
2024
Length
65.5 m (214.9 ft)
Max Span
41.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
323
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$19,092,000
Total Project Cost
$28,638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.