HOLT BRIDGE ROAD over CARTECAY RIVER

6 2 MI SE OF ELLIJAY · County 123, Georgia · Built 2007 · 2 Lanes · 1,030 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012350660
Year Built
2007
Length
43.9 m (144 ft)
Max Span
43.9 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,030
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.