HAMILTON ROAD over WHITE OAK CREEK

7 MI NW OF PALMETTO · County 121, Georgia · Built 1954 · 2 Lanes · 323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012150470
Year Built
1954
Reconstructed
1990
Length
18.3 m (60 ft)
Max Span
9.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
323
Material
Prestressed Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.