VERNON GROVE ROAD over LONGINO CREEK

6 MI NW OF PALMETTO · County 121, Georgia · Built 1956 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000012150440
Year Built
1956
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
5.6 m (18.4 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.