WINDSOR PARKWAY over SR 400

IN N FULTON · County 121, Georgia · Built 1993 · 2 Lanes · 10,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012107520
Year Built
1993
Length
85 m (278.9 ft)
Max Span
37.2 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
10,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,090,000
Total Project Cost
$1,635,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.